W Residences Downtown Dubai

Downtown Dubai (DLD area: Burj Khalifa) · by Dar Global · Running late · Branded: W Hotels

Homes1-bed – 3-bed
KeysWas due Q3 2026
Built72%
Homes in total397
DeveloperDar Global

What stands out

  • W-branded residences overlooking Burj Khalifa and Dubai Fountain
  • main works contract AED 273m

Homes in this building

1-bed
704 – 777 sq ft · 1 bath · AED 2,368/sq ft
fromAED 1.67M
2-bed
1,062 – 1,176 sq ft · 2 baths · AED 2,040/sq ft
fromAED 2.17M
3-bed
1,459 – 1,472 sq ft · 3-4 baths · AED 1,896/sq ft
fromAED 2.77M

What buyers actually paid

19 off-plan sales registered with the Dubai Land Department, June to October 2026.

What's in the building

Shared pool
Gym
Kids' play area
Covered parking

Payment plan

20% down, 60% during construction, 20% on handover

Construction

72% built at the last Dubai Land Department inspection (3 Sept 2026).

Was due: Q3 2026. Completion date registered with the Dubai Land Department: 30 Sept 2026.

About this data: From the developer's published details, with some figures from listing portals.

More in Downtown Dubai

Other apartments under construction nearby

The St. Regis Residences, Downtown Dubai, Downtown DubaiBranded · The St. Regis
The St. Regis Residences, Downtown Dubai76% built
Downtown Dubai
by Emaar Properties
1-bed – 3-bed · Keys Q4 2026
From AED 2.62M
Fairmont Residences Solara Tower, Downtown DubaiBranded · Fairmont
Fairmont Residences Solara Tower
Downtown Dubai
by Sol Properties
1-bed – 3-bed · Keys Q3 2027
From AED 2.7M
Baccarat Hotel & Residences Dubai, Downtown DubaiBranded · Baccarat
Baccarat Hotel & Residences Dubai21% built
Downtown Dubai
by H&H Development
2-bed – 4-bed · Keys Q4 2027
From AED 17M
Mercedes-Benz Places | Binghatti, Downtown DubaiBranded · Mercedes-Benz
Mercedes-Benz Places | Binghatti65% built
Downtown Dubai
by Binghatti Developers
2-bed – 3-bed · Was due Q1 2026
From AED 11.5M
Rove Home Downtown, Downtown DubaiBranded · Rove Hotels
Rove Home Downtown63% built
Downtown Dubai
by IRTH
Studio – 2-bed · Was due Q2 2026
From AED 1.12M
Sofitel Residences Downtown Dubai, Downtown DubaiBranded · Sofitel
Sofitel Residences Downtown Dubai
Downtown Dubai
by Azha Development
1-bed – 3-bed · Keys Q3 2027
From AED 2.11M
Binghatti Skyblade, Downtown Dubai
Binghatti Skyblade
Downtown Dubai
by Binghatti Developers
Studio – 3-bed · Keys Q4 2027
From AED 1.67M
Rixos Financial Center Road Dubai Residences, Downtown DubaiBranded · Rixos
Rixos Financial Center Road Dubai Residences
Downtown Dubai
by East & West Properties
1-bed – 4-bed · Keys Q2 2027
From AED 2.4M

More by Dar Global

Their other projects with keys in 2026–27

DG1 Living, Business Bay & d3
DG1 Living
Business Bay & d3
by Dar Global
Studio – 3-bed · Keys Q4 2026
From AED 1.57M
W Residences Downtown Dubai12 photos
W Residences Downtown Dubai: aerial, photo 1 of 12W Residences Downtown Dubai: exterior, photo 2 of 12W Residences Downtown Dubai: exterior, photo 3 of 12W Residences Downtown Dubai: exterior, photo 4 of 12W Residences Downtown Dubai: exterior, photo 5 of 12W Residences Downtown Dubai: aerial, photo 6 of 12W Residences Downtown Dubai: interior living, photo 7 of 12W Residences Downtown Dubai: interior living, photo 8 of 12W Residences Downtown Dubai: interior bedroom, photo 9 of 12W Residences Downtown Dubai: interior bedroom, photo 10 of 12W Residences Downtown Dubai: amenity, photo 11 of 12W Residences Downtown Dubai: amenity, photo 12 of 12

Your monthly payment

AboutAED 7,224 a month

For a home of AED 1.67M

Loan
Interest over the term
Fees at transfer, about
Cash needed up front

Off-plan homes are usually paid to the developer while they're built (here: 20% down, 60% during construction, 20% on handover), and banks lend on the balance near handover; before completion they lend at most 50%.

Assumes a UAE resident expat buying a first home: banks lend up to 80% (70% above AED 5M) for up to 25 years, and fixed rates run about 3.75–5% today. Fees: 4% DLD transfer fee, 0.25% mortgage registration and about 1% to the bank. An estimate, not a loan offer.