LUM1NAR Tower 1

JVT (DLD: Al Barsha South Fifth) · by Object 1 · Running late

LUM1NAR Tower 1: aerial, photo 1 of 12LUM1NAR Tower 1: exterior, photo 2 of 12LUM1NAR Tower 1: exterior, photo 3 of 12LUM1NAR Tower 1: interior living, photo 4 of 12LUM1NAR Tower 1: interior living, photo 5 of 12LUM1NAR Tower 1: interior living, photo 6 of 12LUM1NAR Tower 1: amenity, photo 7 of 12LUM1NAR Tower 1: amenity, photo 8 of 12LUM1NAR Tower 1: amenity, photo 9 of 12LUM1NAR Tower 1: amenity, photo 10 of 12LUM1NAR Tower 1: floorplan, photo 11 of 12LUM1NAR Tower 1: floorplan, photo 12 of 12
Homes1-bed – 2-bed
KeysWas due Q3 2026
Built33%
Homes in total200
DeveloperObject 1

What stands out

  • matte illuminated glass facade
  • retail at ground floor

Homes in this building

1-bed
576 – 1,267 sq ft · 1 bath · AED 1,540/sq ft
fromAED 887K
2-bed
772 – 994 sq ft · 2 baths · AED 1,425/sq ft
fromAED 1.1M

What buyers actually paid

4 off-plan sales registered with the Dubai Land Department, June to October 2026.

What's in the building

Lobby
Swimming pool
Kids play room
Outdoor lounge
BBQ area
Clubhouse
Pool deck with sun loungers
Gym

Payment plan

30% down, 30% during construction, 40% on handover; or 30/25/5/40 post-handover

Construction

33% built at the last Dubai Land Department inspection (22 Jul 2026).

Was due: Q3 2026. Completion date registered with the Dubai Land Department: 15 Oct 2026.

About this data: From the developer's published details, with some figures from listing portals.

More in JVT

Other apartments under construction nearby

Binghatti Luxuria, JVTSelling now
Binghatti Luxuria7% built
JVT
by Binghatti Developers
Studio – 2-bed · Keys Q3 2027
From AED 767K
Altai Tower, JVTAlmost finished
Altai Tower98% built
JVT
by Tiger Properties
1-bed – 2-bed · Keys 2026
From AED 599K
The Vyne Residences, JVT
The Vyne Residences80% built
JVT
by Metrical Real Estate Development
Studio – 2-bed · Keys Q4 2026
From AED 966K
Fashionz by Danube, JVTBranded · FashionTV
Fashionz by Danube
JVT
by Danube Properties
Studio – 3-bed · Keys Q3 2027
From AED 1.51M
Sonate Residences, JVTSelling now
Sonate Residences
JVT
by Condor Developers
Studio – 3-bed · Keys Q1 2027
From AED 710K
Tréppan Tower, JVTBranded · Tréppan Living
Tréppan Tower
JVT
by Fakhruddin Properties
1-bed – 3-bed · Keys Q2 2027
From AED 1.1M
V1VID Tower, JVT
V1VID Tower12% built
JVT
by Object 1
Studio – 3-bed · Keys Q4 2026
From AED 762K
LUM1NAR Tower 2, JVT
LUM1NAR Tower 231% built
JVT
by Object 1
1-bed – 3-bed · Keys Q4 2026
From AED 1.77M

More by Object 1

Their other projects with keys in 2026–27

THE F1FTH, JVCSelling now
THE F1FTH50% built
JVC
by Object 1
Studio – 2-bed · Was due Q3 2026
From AED 554K
TETR1S Tower, JVCSelling now
TETR1S Tower8% built
JVC
by Object 1
Studio – 3-bed · Keys Q3 2027
From AED 737K
1WOOD Residence 2, JVCPay after keys
1WOOD Residence 20% built
JVC
by Object 1
Studio – 3-bed · Keys Q4 2027
From AED 788K
IR1DIAN PARK 2, JVCSelling now
IR1DIAN PARK 221% built
JVC
by Object 1
Studio – 2-bed · Keys Q2 2027
From AED 828K
V1VID Tower, JVT
V1VID Tower12% built
JVT
by Object 1
Studio – 3-bed · Keys Q4 2026
From AED 762K
LUM1NAR Tower 2, JVT
LUM1NAR Tower 231% built
JVT
by Object 1
1-bed – 3-bed · Keys Q4 2026
From AED 1.77M
EVERGR1N HOUSE, Jumeirah Garden City & Al Satwa
EVERGR1N HOUSE55% built
Jumeirah Garden City & Al Satwa
by Object 1
Studio – 2-bed · Was due Q2 2026
From AED 1.01M
EVERGR1N HOUSE 2, Jumeirah Garden City & Al Satwa
EVERGR1N HOUSE 210% built
Jumeirah Garden City & Al Satwa
by Object 1
Studio – 2-bed · Was due Q3 2026
From AED 992K
LUM1NAR Tower 112 photos
LUM1NAR Tower 1: aerial, photo 1 of 12LUM1NAR Tower 1: exterior, photo 2 of 12LUM1NAR Tower 1: exterior, photo 3 of 12LUM1NAR Tower 1: interior living, photo 4 of 12LUM1NAR Tower 1: interior living, photo 5 of 12LUM1NAR Tower 1: interior living, photo 6 of 12LUM1NAR Tower 1: amenity, photo 7 of 12LUM1NAR Tower 1: amenity, photo 8 of 12LUM1NAR Tower 1: amenity, photo 9 of 12LUM1NAR Tower 1: amenity, photo 10 of 12LUM1NAR Tower 1: floorplan, photo 11 of 12LUM1NAR Tower 1: floorplan, photo 12 of 12

Your monthly payment

AboutAED 3,844 a month

For a home of AED 887K

Loan
Interest over the term
Fees at transfer, about
Cash needed up front

Off-plan homes are usually paid to the developer while they're built (here: 30% down, 30% during construction, 40% on handover; or 30/25/5/40 post-handover), and banks lend on the balance near handover; before completion they lend at most 50%.

Assumes a UAE resident expat buying a first home: banks lend up to 80% (70% above AED 5M) for up to 25 years, and fixed rates run about 3.75–5% today. Fees: 4% DLD transfer fee, 0.25% mortgage registration and about 1% to the bank. An estimate, not a loan offer.