City Walk Northline

Al Wasl · by Meraas

Homes1-bed – 3-bed
KeysQ3 2027
DeveloperMeraas

What stands out

  • low-rise residences next to City Walk and BOXPARK

Homes in this building

1-bed
707 – 881 sq ft · 1 bath · AED 2,588/sq ft
fromAED 1.83M
2-bed
1,179 – 1,940 sq ft · 2-4 baths · AED 2,545/sq ft
fromAED 3M
3-bed
1,808 – 3,957 sq ft · 4-5 baths · AED 2,588/sq ft
fromAED 4.68M

What's in the building

Infinity-edge pools with skyline views
Multi-purpose rooms
Fitness centres
Playgrounds
Double-height lobbies
Private terraces
24/7 security

Payment plan

Option 1: 20% down payment, 55% during construction, 25% handover; Option 2: 20% down payment, 55% during construction, 25% handover

Construction

The Dubai Land Department hasn't published a progress figure for this project yet.

Expected handover: Q3 2027.

About this data: From the developer's published details, with some figures from listing portals.

More in City Walk & Al Wasl

Other apartments under construction nearby

Safa One de GRISOGONO, City Walk & Al WaslBranded · de GRISOGONO
Safa One de GRISOGONO
City Walk & Al Wasl
by DAMAC Properties
1-bed – 4-bed · Keys Q4 2026
From AED 3.23M
Central Park Plaza, City Walk & Al Wasl
Central Park Plaza44% built
City Walk & Al Wasl
by Meraas
1-bed – 4-bed · Was due Q3 2026
From AED 2.73M
Couture by Cavalli, City Walk & Al WaslBranded · Roberto Cavalli
Couture by Cavalli
City Walk & Al Wasl
by DAMAC Properties
3-bed – 5+ bed · Keys Q4 2027
From AED 21.9M
Eden House The Park, City Walk & Al Wasl
Eden House The Park
City Walk & Al Wasl
by H&H Development
Studio – 4-bed · Keys Q1 2027
From AED 3.2M
Mr. C Residences Downtown, City Walk & Al WaslBranded · Mr. C
Mr. C Residences Downtown
City Walk & Al Wasl
by ALTA Real Estate Development
2-bed – 4-bed · Keys Q1 2027
From AED 8.1M
Casa AHS, City Walk & Al WaslSelling now
Casa AHS
City Walk & Al Wasl
by AHS Properties
5+ bed · Keys Q2 2027
From AED 23.5M

More by Meraas

Their other projects with keys in 2026–27

Central Park Plaza, City Walk & Al Wasl
Central Park Plaza44% built
City Walk & Al Wasl
by Meraas
1-bed – 4-bed · Was due Q3 2026
From AED 2.73M
Elara, Umm Suqeim & Madinat Jumeirah
Elara64% built
Umm Suqeim & Madinat Jumeirah
by Meraas
1-bed – 4-bed · Keys Q4 2026
From AED 2.3M
Bluewaters Bay, Bluewaters
Bluewaters Bay
Bluewaters
by Meraas
1-bed – 4-bed · Keys Q1 2027
From AED 2.85M
Riwa, Umm Suqeim & Madinat Jumeirah
Riwa
Umm Suqeim & Madinat Jumeirah
by Meraas
1-bed – 4-bed · Keys Q3 2027
From AED 2.35M
Bulgari Lighthouse, Jumeirah & La MerBranded · Bulgari
Bulgari Lighthouse
Jumeirah & La Mer
by Meraas
Penthouses · Keys Q1 2027
From AED 63M
Elara at Madinat Jumeirah Living, Umm Suqeim & Madinat Jumeirah
Elara at Madinat Jumeirah Living64% built
Umm Suqeim & Madinat Jumeirah
by Meraas
1-bed – 4-bed · Keys Q4 2026
From AED 2.3M
Design Quarter, Business Bay & d3
Design Quarter
Business Bay & d3
by Meraas
1-bed – 3-bed · Keys Q1 2027
From AED 1.75M
City Walk Northline8 photos
City Walk Northline: exterior, photo 1 of 8City Walk Northline: exterior, photo 2 of 8City Walk Northline: exterior, photo 3 of 8City Walk Northline: exterior, photo 4 of 8City Walk Northline: interior living, photo 5 of 8City Walk Northline: floorplan, photo 6 of 8City Walk Northline: floorplan, photo 7 of 8City Walk Northline: floorplan, photo 8 of 8

Your monthly payment

AboutAED 7,931 a month

For a home of AED 1.83M

Loan
Interest over the term
Fees at transfer, about
Cash needed up front

Off-plan homes are usually paid to the developer while they're built (here: Option 1: 20% down payment, 55% during construction, 25% handover; Option 2: 20% down payment, 55% during construction, 25% handover), and banks lend on the balance near handover; before completion they lend at most 50%.

Assumes a UAE resident expat buying a first home: banks lend up to 80% (70% above AED 5M) for up to 25 years, and fixed rates run about 3.75–5% today. Fees: 4% DLD transfer fee, 0.25% mortgage registration and about 1% to the bank. An estimate, not a loan offer.