Avana Residences

JVC District 10 · by DECA Properties

Avana Residences: exterior, photo 1 of 12Avana Residences: interior living, photo 2 of 12Avana Residences: interior living, photo 3 of 12Avana Residences: exterior, photo 4 of 12Avana Residences: aerial, photo 5 of 12Avana Residences: interior living, photo 6 of 12Avana Residences: interior living, photo 7 of 12Avana Residences: interior bedroom, photo 8 of 12Avana Residences: interior bedroom, photo 9 of 12Avana Residences: interior kitchen, photo 10 of 12Avana Residences: amenity, photo 11 of 12Avana Residences: amenity, photo 12 of 12
HomesStudio – 2-bed
KeysQ4 2027
DeveloperDECA Properties

What stands out

  • marine-inspired sculptural facade
  • European appliances

Homes in this building

Studio
373 – 394 sq ft · 1 bath · AED 1,997/sq ft
fromAED 745K
1-bed
699 – 705 sq ft · 2 baths · AED 1,871/sq ft
fromAED 1.31M
2-bed
1,068 – 1,324 sq ft · 3 baths · AED 1,667/sq ft
fromAED 1.78M

What's in the building

Resort-style pool
Ocean-inspired kids play zone
Rooftop lily-pad canopies
Landscaped terraces
Shaded decks

Payment plan

60/40 post-handover: 10% on booking, 10% within 30 days, 40% during construction, 10% on completion, 30% post-handover

Construction

The Dubai Land Department hasn't published a progress figure for this project yet.

Expected handover: Q4 2027.

About this data: From the developer's published details, with some figures from listing portals.

More in JVC

Other apartments under construction nearby

SAMANA Waves, JVCAlmost finished
SAMANA Waves90% built
JVC
by Samana Developers
Studio – 2-bed · Keys Q1 2027
From AED 476K
Binghatti Etherea, JVCSelling now
Binghatti Etherea7% built
JVC
by Binghatti Developers
Studio – 2-bed · Keys Q3 2027
From AED 765K
Binghatti Ruby, JVC
Binghatti Ruby46% built
JVC
by Binghatti Developers
Studio – 3-bed · Was due Q1 2026
From AED 700K
Luxor by Imtiaz, JVCAlmost finished
Luxor by Imtiaz90% built
JVC
by Imtiaz Developments
Studio – 2-bed · Was due Q3 2026
From AED 685K
THE F1FTH, JVCSelling now
THE F1FTH50% built
JVC
by Object 1
Studio – 2-bed · Was due Q3 2026
From AED 554K
Binghatti Amberhall, JVC
Binghatti Amberhall38% built
JVC
by Binghatti Developers
Studio – 2-bed · Was due Q1 2026
From AED 1M
Elysee Heights, JVCPay after keys
Elysee Heights81% built
JVC
by Pantheon Development
Studio – 2-bed · Was due Q2 2026
From AED 565K
Violet Tower, JVCPay after keys
Violet Tower70% built
JVC
by Dubai Investments
Studio – 2-bed · Keys Q4 2026
From AED 1.64M
Avana Residences12 photos
Avana Residences: exterior, photo 1 of 12Avana Residences: interior living, photo 2 of 12Avana Residences: interior living, photo 3 of 12Avana Residences: exterior, photo 4 of 12Avana Residences: aerial, photo 5 of 12Avana Residences: interior living, photo 6 of 12Avana Residences: interior living, photo 7 of 12Avana Residences: interior bedroom, photo 8 of 12Avana Residences: interior bedroom, photo 9 of 12Avana Residences: interior kitchen, photo 10 of 12Avana Residences: amenity, photo 11 of 12Avana Residences: amenity, photo 12 of 12

Your monthly payment

AboutAED 3,229 a month

For a home of AED 745K

Loan
Interest over the term
Fees at transfer, about
Cash needed up front

Off-plan homes are usually paid to the developer while they're built (here: 60/40 post-handover: 10% on booking, 10% within 30 days, 40% during construction, 10% on completion, 30% post-handover), and banks lend on the balance near handover; before completion they lend at most 50%.

Assumes a UAE resident expat buying a first home: banks lend up to 80% (70% above AED 5M) for up to 25 years, and fixed rates run about 3.75–5% today. Fees: 4% DLD transfer fee, 0.25% mortgage registration and about 1% to the bank. An estimate, not a loan offer.